Products Specs Trading Calender Fees Rules Education Back to Top
Home / Services / Technology / Technical Specification & Resource

Shanghai Futures Exchange Member Link Redundancy Exercise Report

Updated on Jun 16,2012

Member name

(Seal)

 

Member ID

 

Login username of remote seat

 

Remote seat information

Trading software vendor and version

 

Fax

 

Name of technical contact person

 

Contact phone

 

Contact mobile phone

 

Contact Email

 

Member-end access address

(On which floor)

 

Link information

Link ID connected to Futures Building Data Center

 

Link ID connected to Zhangjiang Data Center

 

Router WAN IP 

 

Router WAN IP

 

Address of test offering machine 1

 

Address of test offering machine 2

 

Test method

1

Under normal circumstances, test whether it can be achieved to visit the front-end servers of three Data Centers of the Exchange (192.168.11.31, 192.168.12.41 and 192.168.16.31)  through the links to Futures Building and Zhangjiang.

Line connectivity:

 

Is the application normal or not:

2

When failures occur to the router or line directly connected toFutures Building, test whether it can be achieved to visit the front-end servers of three Data Centers of the Exchange (192.168.11.31, 192.168.12.41 and 192.168.16.31) through the link to Zhangjiang, and whether the trades can be conducted.

Line connectivity:

 

Is the application switching normal or not:

3

When failures occur to the router or line directly connected toZhangjiang Data Center, test whether it can be achieved to visit the front-end servers of three Data Centers of the Exchange (192.168.11.31, 192.168.12.41 and 192.168.16.31) through the link to Zhangjiang, and whether the trades can be conducted.

Line connectivity:

 

Is the application switching normal or not:

4

When failures simultaneously occur to the routers or lines directly connected to Futures Building Data Center and Zhangjiang Data Center (the simulation of the situation that Futures Building and Zhangjiang Data Centers are unusable, and the trades are switched to Beijing Data Center), test whether it can be achieved to visit the front-end server of Beijing Data Center through the links directly connected to DCE, ZCE or CFFEX, and whether the trading tests can be conducted.

Line connectivity:

 

Is the application switching normal or not:

Remark

 

 

 

 

 

 

 

 

 

 

 

 

Notes:

(1) This form should be filled out by the member companies connected to Shanghai Futures Exchange;

(2) The form should be sealed by the member companies, and sent to Shanghai Futures Exchange Information Technology Center by fax or hand.

 

'textz?#g:Яv??wpagination:widow-orphan'> 

 

 

 

Notes:

(1) This form should be filled out by the information service providers unit connected to Shanghai Futures Exchange;

(2) The form should be sealed by the information service providers, and sent to Shanghai Futures Exchange Information Technology Center by fax or hand.

 

Access the Market